Thursday, November 21st, 2024

Delay in Mid-Hill Highway construction draws public wrath


18 November 2021  

Time taken to read : 1 Minute


  • A
  • A
  • A

BALEWA: Local youths have staged a demonstration for dillydally in the up-gradation and blacktopping of Baglung-Ghodabandh road section along the Pushpalal Mid-Hill Highway.

Youths of Kathekhola Rural Municipality wards 5 and 6, Bihun staged protest by hoisting black flag and black armband.

Irate youths have ascended to the street with symbolic protest against the apathy of authorities towards road up-gradation.

The locals called for immediate blacktopping of Bihun section along the highway. Divas Kandel, a local youth, said blacktopping was stalled due to sheer negligence on part of the contractor company.

Kandel further said that youths have put forth several demands, including termination of license of Contractor Company and resumption of construction works in a speedy manner.

They have resorted to launch a protest campaign as the construction works have long been held in absence of the company responsible for building the road section from Akchhete to Inarpani of Bihun.

Publish Date : 18 November 2021 11:43 AM

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the

Finance Ministry reports uptick in revenue collection

KATHMANDU: Revenue collection in the first quarter of the current