Sunday, February 15th, 2026

Traffic resumes on Karnali corridor road



KARNALI: The Karnali corridor road which was obstructed due to landslide at different sections has resumed.

The landslide debris that had deposited on the road at Bar, Gobrebhid, Kholibazaar and Simkhet along the Lalighat of Kalikot district to Sallisalla of Humla has been removed and traffic resumed on this section of the corridor highway.

The landslide had deposited huge boulders at different places along the roadway. The Nepali Army had worked continuously to open the road.

Nepali Army Major, Prem Karki said the road has been opened after 15 days since it got blocked.

The Kalikot, Bajura and Humla folks faced much inconvenience due to the disruption of vehicular traffic.

Karnali corridor roadway was obstructed due to the landslide triggered by incessant rains for four days since October 17.

Publish Date : 05 November 2021 15:24 PM

Kulman Ghising-led Ujyalo Nepal unveils election manifesto

KATHMANDU: The Ujyala Nepal Party, chaired by Kulman Ghising, unveiled

ICC World Cup: Nepal suffers heavy defeat against West Indies

KATHMANDU: Nepal suffered a heavy 9-wicket defeat against the West

Atmosphere of confidence not ready for polls: Oli

JHAPA: CPN-UML Chairman KP Sharma Oli, arriving in Jhapa on

Man dies after scooter hits pedestrian in Gaindakot

NAWALPUR: A pedestrian died after being struck by a scooter

ICC T20: Nepal set 134-run target for West Indies

KATHMANDU: With a fighting half-century from Dipendra Singh Airee, Nepal