Wednesday, December 17th, 2025

Traffic resumes on Karnali corridor road



KARNALI: The Karnali corridor road which was obstructed due to landslide at different sections has resumed.

The landslide debris that had deposited on the road at Bar, Gobrebhid, Kholibazaar and Simkhet along the Lalighat of Kalikot district to Sallisalla of Humla has been removed and traffic resumed on this section of the corridor highway.

The landslide had deposited huge boulders at different places along the roadway. The Nepali Army had worked continuously to open the road.

Nepali Army Major, Prem Karki said the road has been opened after 15 days since it got blocked.

The Kalikot, Bajura and Humla folks faced much inconvenience due to the disruption of vehicular traffic.

Karnali corridor roadway was obstructed due to the landslide triggered by incessant rains for four days since October 17.

Publish Date : 05 November 2021 15:24 PM

Lalitpur Metropolitan celebrates 107th foundation day

LALITPUR: Lalitpur Metropolitan City marked its 107th foundation day on

Real estate transactions nearly doubled last month

KATHMANDU: Real estate transactions in Nepal nearly doubled in the

UML General Convention: Vote counting to begin tonight

KATHMANDU: Voting is underway at Bhrikutimandap in Kathmandu to elect

What we know about Trump’s $10 billion lawsuit against the BBC

FLORIDA: US President Donald Trump has filed a $10 billion defamation

Minister Ghising says efforts underway with India to release irrigation water from Tanakpur Barrage

KANCHANPUR: Minister for Energy, Water Resources and Irrigation, Physical Infrastructure