Thursday, November 21st, 2024

Flood sweeps away Karnali bridge construction materials


20 October 2021  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KARNALI: The flood-fed Karnali River swept away materials of under-construction bridge linking Surkhet and Kailali.

According to the Province Police Office, Surkhet, the flooding occurred on Tuesday took away construction materials of the cemented bridge connecting Surkhet and Kailali.

Police informed the flooding took away Gavin wire and mixture machine, among other construction materials of the bridge. Janak Construction Pvt Ltd was awarded the contract for the construction.

Even the crane has also been waterlogged. A team of police has been mobilized to collect details of loss and damage after the flooding blew away the construction materials.

Likewise, 20 households of Dailekh’s Ramghat Bazaar near the river have been relocated with the rise in the risks of flooding.
Likewise, incessant rain has disrupted Surkhet-Jumla road (Karnali highway) section in its several sections and efforts are underway to resume the road traffic.

Publish Date : 20 October 2021 08:34 AM

People’s representatives should be responsible for public service: Prachanda

DAMAULI: CPN (Maoist Centre) Chairperson and former Prime Minister Pushpa

Minister Yadav directs smooth distribution of Melamchi Water in Kathmandu

KATHMANDU: Minister for Water Supply, Pradip Yadav, has instructed daily

NC to discuss current economic situation and way forward

KATHMANDU: The Nepali Congress is to hold a discussion on

Private medical colleges, govt. hospitals directed to make service fees public

KATHMANDU: The Ministry of Health and Population has asked the

Finance Ministry reports uptick in revenue collection

KATHMANDU: Revenue collection in the first quarter of the current