Saturday, September 12th, 2026

Alternative to Mechi highway to be used in Ilam



ILAM: An alternative road will be used after the road on the Mechi Highway near Dhobidhara in Ilam Municipality was obstructed by landslides.

More than 85 percent of the road was blocked by landslides on Saturday morning.

As the highway cannot be repaired or improved immediately, the vehicles will be diverted towards the alternative road.

The Ilam Municipality has said that it has decided to request the Division Road Office Ilam to speed up the maintenance work of the damaged road.

Light vehicles coming from Bhanupath to Chowk Bazaar will be diverted to the highway through one-way traffic.

Similarly, light vehicles coming to Ilam Bazaar from Dhobidhara will be diverted to Tundikhel from Nepal Bank via the Forest Office, said Ram Kumar Shah, Administrative Officer of Ilam Municipality.

As the culvert near Narayansthan is in dilapidated condition and could collapse at any time, heavy vehicles including good carrier trucks will be stopped from operating on the road until the Mechi Highway is operational.

It has been decided to request the District Traffic Police Office to inform the transport entrepreneurs accordingly and manage traffic on the alternative route.

RSS

Publish Date : 03 October 2021 09:04 AM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process