Friday, November 22nd, 2024

Upper Trishuli III ‘A’ connected to national grid


16 May 2019  

Time taken to read : < 1 Minute


  • A
  • A
  • A

KATHMANDU: The Upper Trishuli III ‘A’ has finally been connected to the national grid on Thursday.

Executive Director of Nepal Electricity Authority (NEA), Kulman Ghising, switched the control room of switchyard at Simle, Kispang-5 in Nuwakot and announced that the project was now connected to the national grid.

With the production of 30 MW electricity from the first unit, the project got completion.

Publish Date : 16 May 2019 19:29 PM

Supporters of Durga Prasai hold protest rally in Koteshwor

KATHMANDU: Supporters of medical entrepreneur Durga Prasai have protested in

UML rally moves towards Durbar Marg

KATHMANDU: The assembly of the ruling CPN-UML, originally scheduled to

Foreign Minister Rana to travel to Germany after China visit

KATHMANDU: Foreign Minister Dr. Arzu Rana is scheduled to visit

Gold price up by Rs 1,500 per tola today

KATHMANDU: The price of gold has increased in the Nepali

Tea worth Rs 114 million exported

JHAPA: The Nepal Multipurpose Cooperative (NMC) organization has exported Nepal’s