Monday, November 23rd, 2026

Flood washes away powerhouse for Darkhola II micro hydropower project in Myagdi



MYAGDI: A powerhouse for the Darkhola II micro-hydro power project at Dhawalagiri Rural Municipality-2 in Myagdi district has been swept away by the flood, disconnecting power to the villages.

As a result, property relating to the project is worth over Rs 15 million, said the rural municipality chair Thamasara Pun.

Constructed two years ago at a cost of Rs 25 million, 378 houses at Lulang, Khoriya, Merani, and Lamsung villages had been availing electricity from the project.

Flooding caused by rain on Sunday night washed away a building housing the powerhouse, he said, adding that dams and canals constructed for the project were also damaged in the disaster.

Without electricity, local people have faced difficulties in many ways, said Nagendra Thakur, headteacher of local Lulang basic school.

Publish Date : 06 September 2021 21:26 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Arrest warrant issued against former Bagmati Chief Minister Indra Baniya

KATHMANDU: An arrest warrant has been issued against former Bagmati

India cherishes special friendship with Nepal, says Jaishankar after meeting Balen Shah

KATHMANDU: Indian External Affairs Minister Dr. S. Jaishankar has reiterated

PM Shah and PM Modi to jointly inaugurate 669 MW Lower Arun project

KATHMANDU: Prime Minister (PM) Balendra Shah and his Indian counterpart,

PM Shah, Jaishankar hold 30-minute meeting ahead of India visit’s key engagements

NEW DELHI: The meeting between Nepal’s Prime Minister Balendra Shah