Monday, December 22nd, 2025

Traffic disrupted at Ramchandra Bhanjyang



HETAUDA: Vehicular movement has been disrupted at Ramchandra Bhanjyang along the Kulekhani-Sisneri-Daxinkali road section of the Madan Bhandari Highway.

The road section is disrupted after a dry landslide occurred at the place this morning.

The landslide debris has covered some 35 metres of the road section halting the traffic there.

Police have shared that the technical team has reached the site to remove the debris and resume the traffic.

Police further assured that the road section would be opened and traffic will resume by this evening.

RSS

Publish Date : 23 July 2021 12:29 PM

Sudurpashchim Provincial Assembly meeting set for December 26

SUDURPASCHIM: The long-awaited session of the Sudurpashchim Provincial Assembly, which

MCA-Nepal signs contracts worth USD 23.7 million for road maintenance under MCC Compact

KATHMANDU: MCA-Nepal has signed two major contracts worth approximately USD

Elections will be held on time, assures Prime Minister Karki

KATHMANDU: Prime Minister Sushila Karki has called on all political

Imports rise 15.83% to Rs 766.18 billion in five months; exports jump 58.17%

KATHMANDU: Nepal’s merchandise imports increased by 15.83 percent in the

High-level commission begins work on transport sector reforms

KATHMANDU: A high-level commission formed by the government to investigate