Saturday, September 12th, 2026

Speed test of Janakur-Jayanagar railway track being conducted Sunday



KATHMANDU: Speed test and certification of Janakur-Jayanagar railway track is taking place Sunday as part of pre-operation preparation.

Guru Bhattarai, general manager of Nepal Railway Company, informed this through a Facebook post on Saturday. According to Bhattarai, a diesel locomotive of East Central Railway of India will be used in the speed test.

Stating that the locomotive will travel at the speed of 120 kilometers per hour during the test, he urged the public to keep their distance from the track and not to leave people, cows, buffaloes, four-wheelers, bicycles, motorcycles and children on the track.

He added adequate security personnel would be deployed along the tracks during the test and people would also be warned by through loudspeakers before the test.

He urged the people of Jayanagar-Janakpur-Kurta section to abide by safety measures as information about the test was circulated since Saturday.

Publish Date : 17 July 2021 19:00 PM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process