Saturday, April 4th, 2026

Flood-damaged Lower Modi-1 hydel project begins power production



PARBAT: The Lower Modi-1 hydropower project in Parbat district that was damaged by flood on July 6 night has begun generating electricity from Sunday.

The 10-megawatt hydropower project was damaged due to floods in Sundarekhola at Dobilla in Kushma Rural Municipality-8 and Modi River in the district, according to the United Modi Hydro Power Limited’s managing director Upendra Gautam.

The 300-meter stretch of the canal in the Hydel was damaged in the disaster. Over 50 technicians and staffers of the Project worked regularly for a week to repair the flood-damaged hydropower project.

The Hydel produces 9.5 megawatts of electricity on Sunday upon the maintenance, informed Gautam adding that the scale of damaged was evaluated to come around Rs 50 million.

The power production house of the Hydel, however, did not meet the same fate as the sewerage of the Hydel, he said. Details of the damages were being collected and assessed since the water level in the Modi River was still very high.

The swollen Sundarekhola River had swept away a vehicle being used by the Mid-Hill Highway Project on the same day.
RSS

Publish Date : 12 July 2021 14:21 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

CM Baniya urges bank interest waiver for traders affected by Hetauda road expansion

BAGMATI: Chief Minister of Bagmati Province, Indra Bahadur Baniya, has

Health Ministry’s directive to designate ‘focal person’

KATHMANDU: The Ministry of Health and Population has issued directive

19 construction companies asked to clarify for failing to start projects in Khotang

KHOTANG: The Infrastructure Development Office Khotang has sought written clarification

Pokhara begins removing illegal structures along Phewa Lake

GANDAKI: Pokhara Metropolitan City has started removing structures built in