Saturday, November 23rd, 2024

One-way traffic resumes in BP Highway


04 July 2021  

Time taken to read : < 1 Minute


  • A
  • A
  • A

BANEPA: The BP highway has been resumed for traffic after the obstruction due to floods in Mamti river in Roshi rural municipality was cleared.

One-way traffic has been resumed at the joint initiative of police, the rural municipality, road project and locals.

The road section in the border of ward nos 11 and 12 of the rural municipality remained closed since 12:00 midnight on Friday and resumed at 2:30 pm on Saturday, police inspector at Area Police Office, Mangaltar Sherkhar Khadka said.

A dozer was used to clear the sludge gathered on the road and hence one-way traffic was resumed. A large number of vehicles and their passengers had remained stranded as a result.

Publish Date : 04 July 2021 11:15 AM

Protest in Kathmandu against Israel’s atrocities in Palestine

KATHMANDU: A protest was held at Maitighar Mandala in Kathmandu

Mundhum Trail Visit Year 2025: Preparation on to attract at least 100,000 visitors

KHOTANG: Preparations are going on in full-swing to launch the

PM Oli visits hospital to inquire about father’s health

KATHMANDU: Prime Minister KP Sharma Oli has taken stock of

Tourism Minister Pandey commits for sustainable operation of  Gautam Buddha International Airport

LUMBINI: Culture, Tourism, and Civil Aviation Minister Badri Prasad Pandey

One held on charge of human trafficking

CHITWAN: The District Police Office, Chitwan has arrested a person