Saturday, September 12th, 2026

Flood causes cracks in East-West Highway in Rupandehi

Transportation blocked in the highway



BUTWAL: Traffic has been disrupted in Rupandehi section of the East-West Highway due to flooding induced by continuous rainfall that started since Monday.

According to sources, the diversion road near Charange on the Butwal-Devadaha road section has been washed away by the flood.

The road has been blocked since 12:30 pm today. Vehicles have been stranded on both sides of the road after the road was washed away.

During the expansion of the highway, a diversion road was built to ease transportation for the four-lane bridge  under-construction.

Publish Date : 15 June 2021 17:57 PM

Three unlicensed guns found in forest; woman arrested with drugs

BAGLUNG: A police patrol team recovered three unlicensed guns from

Seven bodies recovered from Upper Trishuli-1 hydropower project

RASUWA: Seven bodies have been recovered from the flood-damaged Upper

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process