Sunday, July 5th, 2026

Besisahar-Chame road obstructed



LAMJUNG: The Besisahar-Chame roadway has been obstructed. The road connecting Lamjung and Manang districts has been blocked due to the occurrence of landslide following incessant rain since Tuesday night.

The road has been obstructed at Puwakhola of Besisahar Municipality-7 and Kharkharebhir of the Municipality-6.

The flooded Puwakhola river washed away five to six meters road and the mudslide along with boulders occurred at Kharkharebhir has blocked the road up to about 40 meters at this point, according to Suman Adhikari, sub-engineer of the Dumre-Besisahar-Chame Road Project Office.

Vehicular movement has come to halt due to the obstruction.

The Office said problem has been faced in opening the road section due to the continuous rain.

Publish Date : 23 September 2020 18:05 PM

Two arrested in Rs 39 lakh foreign employment fraud case

KATHMANDU: Police have arrested two youths on charges of defrauding

Real estate and stock market investment cannot drive economy: Thapa

KATHMANDU: Former Executive Director of Nepal Rastra Bank, Nar Bahadur

Govt committed to press freedom: Minister Timilsina

LALITPUR: Minister for Information and Communications Dr. Bikram Timilsina has

Seven killed, 25 injured in disasters across Nepal in 24 hours

KATHMANDU: Seven people lost their lives and 25 others were

PM Shah to hold first one-on-one meeting with ADB chief

KATHMANDU: Prime Minister (PM) Balen Shah is set to hold