Sunday, January 19th, 2025

Besisahar-Chame road obstructed


23 September 2020  

Time taken to read : < 1 Minute


  • A
  • A
  • A

LAMJUNG: The Besisahar-Chame roadway has been obstructed. The road connecting Lamjung and Manang districts has been blocked due to the occurrence of landslide following incessant rain since Tuesday night.

The road has been obstructed at Puwakhola of Besisahar Municipality-7 and Kharkharebhir of the Municipality-6.

The flooded Puwakhola river washed away five to six meters road and the mudslide along with boulders occurred at Kharkharebhir has blocked the road up to about 40 meters at this point, according to Suman Adhikari, sub-engineer of the Dumre-Besisahar-Chame Road Project Office.

Vehicular movement has come to halt due to the obstruction.

The Office said problem has been faced in opening the road section due to the continuous rain.

Publish Date : 23 September 2020 18:05 PM

Today’s news in a nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Nepal into Kho Kho World Cup Women’s final

KATHAMANDU: The Nepali Women’s National Kho Kho Team has zoomed

1.6 million adolescent girls to be inoculated against cervical cancer

KATHMANDU: Minister for Health and Population Pradeep Paudel said the

Agro ambulance service in the offing at local level

BAGLUNG: Jaimini Municipality is preparing to operate agriculture ambulance service

Bhim Rawal accuses Oli of authoritarian tendencies

KATHMANDU:  Dr. Bhim Rawal, proponent of the “Motherland Awakening Campaign,”