Saturday, February 28th, 2026

India willing to prepare DPR of Kathmandu-Raxaul railway



KATHMANDU: India is willing to start work on the Detailed Project Report (DPR) of the Kathmandu-Raxaul Railway.

India has shown willingness to move ahead with the work of DPR of the railway in a letter written to Nepal.

According to Director General of the Railway Department, Balram Mishra, the Indian team is ready to come to Nepal to prepare the DPR before a formal understanding is reached with Nepal.

The Department has requested to send details to India in a formal format on how to proceed a work.

India is ready to allow them to come and work in Nepal after sending various details including the names of those who come in formal format.

India has already allocated the required budget for the DPR of the railway, said an official of the Railway Department.

Nepal had sent a formal proposal to India on the DPR of the railway a few months ago.

According to Director General Mishra, a formal understanding will be initiated between the two sides once the DPR starts.

A Memorandum of Understanding (MoU) was signed between Nepal and India on 31 August 2020 for the preliminary feasibility study of the Raxaul-Kathmandu Railway.

The Indian Railway Technician had started the preliminary feasibility study on June 8, 2018.

India has already given the report of the preliminary engineering and traffic survey of this railway to Nepal.

According to a preliminary report prepared by the Indian company Konkan Railway Corporation Limited (KRCL), the length of the proposed Raxaul-Kathmandu railway will be 136 kilometers.

Mishra said that it was proposed to build this railway from Nijgadh to Khokna. Preliminary reports have come that the inter-country railway connecting with India will be built on broad gauge.

However, the government of Nepal has been urging to build the railway in standard gauge.

The proposed railway will have a tunnel in about 40 km section. Railways have to be built within 40 kilometers of the tunnel. It is seen that about 35 bridges have to be built in different places.

Publish Date : 10 September 2020 16:12 PM

Trump urges Iranians to ‘take over your government’ as US, Israel launch strikes on Iran

WASHINGTON/TEHRAN: Donald Trump has appealed to the Iranian people to

Israel launches daylight strike on Tehran amid rising tensions over US-Iran nuclear talks

TEHRAN: Israel launched a daylight attack on Iran’s capital on

Nighttime businesses barred in Kaski from Monday citing election security concerns

GANDAKI: The District Administration Office (DAO) in Kaski has imposed

Manjil Rana terms black flag incident during Magar Diwas event as peaceful dissent

TANAHUN: Manjil Rana, candidate of the Ujyalo Nepal Party from

Nighttime businesses in Kathmandu to remain closed from March 2 to 5

KATHMANDU: The District Administration Office (DAO), Kathmandu, has decided to