Friday, April 3rd, 2026

Power supply to three districts obstructed due to floods



KHOTANG: Power supply to Khotang, Okhaldhunga and Solukhumnu has been obstructed after power supply poles were brought down by floods triggered by a heavy downpour.

Two poles of the Gaighat-Diktel 33 KV transmission line were uprooted by the flooded Triyuga River in Udayapur on Saturday noon.

As a result, thousands of consumers in the three districts have been deprived of regular power supply.

The rising water level in the river has made it difficult to replace the uprooted poles, said Nepal Electricity Authority Khotang Chief Ram Dinesh Raya Yadav. Hence, it will take some time to resume power supply to the three districts.

Power to Khotang, Okhaldhunga and Solukhumbu is extended through the NEA sub-station in Buipa of Khotang. RSS

Publish Date : 12 July 2020 11:40 AM

Department of Foreign Employment abolishes token system

KATHMANDU: The Department of Foreign Employment has abolished the token

Nepali citizen Amrit Jha safe in Iran: MoFA

KATHMANDU: The Ministry of Foreign Affairs (MoFA) has confirmed that

Preparations underway to abolish two bodies of Ministry of Communications

KATHMANDU: The Prime Minister’s Office has initiated steps to abolish

21 Nepalis injured in ongoing West Asia conflict: MoFA

KATHMANDU: The Ministry of Foreign Affairs (MoFA) has reported that

SC orders schools not to enroll students before academic session starts

KATHMANDU: The Supreme Court (sc) has instructed the government and