Tuesday, June 23rd, 2026

Siruwari landslide blocks Beni–Jomsom road



MYAGDI: The Beni–Jomsom–Korala road section in Myagdi, which connects Nepal with the Korala border of China via Mustang, has been blocked since this morning following a landslide.

The road was obstructed after a landslide at Upper Baisari (Siruwari) in Raghuganga Rural Municipality-2, cutting off traffic along the 76-kilometre stretch of the Beni–Jomsom road.

According to Police Inspector Sagar Timilsina of the District Police Office, coordination has been made with the Department of Roads and the Beni–Jomsom–Korala Road Project, and equipment has been mobilised to clear the debris.

Due to the obstruction, vehicles travelling from Beni towards Mustang and from Jomsom towards Beni have been halted en route. Locals, along with tourists and pilgrims heading to Mustang and Muktinath, have been affected.

Authorities said landslides are a recurring problem in the Siruwari area during rainfall, posing a continuing challenge to smooth and regular traffic along the highway.

Publish Date : 27 May 2026 07:29 AM

Vaccine shortages and delays fuel rabies risk

KATHMANDU: A 48-year-old man from Chandragiri, Kathmandu, died of rabies

NRB sets today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has announced the foreign exchange

Messi sets new World Cup scoring mark

DALLAS: Lionel Messi became the highest scorer in World Cup

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Nine Foreign Ministry officials among 18 charged in e-passport corruption case

KATHMANDU: Nine officials associated with the Ministry of Foreign Affairs