Monday, July 13th, 2026

Besisahar–Chame road blocked due to landslide



LAMJUNG: The Besisahar–Chame road, which connects Lamjung to Manang, has been blocked following a landslide triggered by continuous rainfall.

According to the District Police Office, Lamjung, the blockage occurred this morning at Kharkhare Bhir in Besisahar Municipality–6 after heavy rain that began Thursday evening.

The landslide has disrupted traffic along the key route, stranding dozens of vehicles traveling to and from Manang and other destinations via Besisahar.

Police said the Besisahar–Ghalegaun road section has also been obstructed by landslides. The road was blocked at Puma Bhir in Besisahar–6, further affecting local transportation.

Publish Date : 19 June 2026 08:53 AM

Monsoon intensifies with heavy rain warning today

KATHMANDU: Active monsoon winds are expected to bring widespread rainfall

NRB issues today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Bhanu Jayanti being observed today

KATHMANDU: The 213th birth anniversary of Adikabi Bhanubhakta Acharya is

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Flood on Modi Khola cuts off road to Ghandruk, damages homes and hydropower plants

KATHMANDU: Flooding in the Modi Khola triggered by heavy rainfall