Saturday, October 10th, 2026

Vehicular movement resumes along flood-damaged Krishnabhir section



KATHMANDU: Vehicular movement along the Krishnabhir section of the Nagdhunga-Muglin road has resumed from today following the completion of a new track constructed to bypass the section damaged by floods.

The new track was opened along the Prithvi Highway after the original road section was blocked by flood-induced damage, disrupting traffic along the major route connecting Kathmandu with various parts of the country.

Prime Minister Balendra Shah’s Secretariat on Wednesday shared drone footage of Krishnabhir, confirming the completion of the track-opening work.

The road section had remained blocked since August 30, severely affecting the transportation of essential commodities, including food, liquefied petroleum gas (LPG), and fuel, to the Kathmandu Valley.

With vehicular movement now restored, authorities expect the transportation and supply of essential goods to the Valley to become easier and gradually return to normal.

Publish Date : 17 September 2026 07:20 AM

Trump hails Russia deal to supply diesel as “big deal” amid Zelenskyy’s criticism

WASHINGTON DC: Amid Ukrainian President Volodymyr Zelenskyy’s criticism of easing

Rain and thunderstorms expected in parts of Nepal today

KATHMANDU: Rainfall accompanied by thunder and lightning is expected in

Nepal, Australia reaffirm ties during Foreign Minister Khanal’s visit

KATHMANDU: Foreign Minister Shisir Khanal paid a courtesy call on

Nepal Rastra Bank fixes foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Gagan Thapa elected Nepali Congress President

KATHMANDU: Gagan Thapa has been elected president of the Nepali