Wednesday, October 14th, 2026

NA begins blasting to reopen flood-damaged Prithvi Highway



DHADING: The Nepali Army (NA) has begun blasting work along the Sital Bazaar section of the Prithvi Highway in Dhading to reopen the road after a portion of the highway was washed away by the Trishuli River during the recent floods.

As immediate reconstruction of a retaining wall at the damaged section was not considered feasible, an engineering team from the Kali Prasad Battalion under the Nepali Army’s Central Command has been mobilised for the operation. According to the project, the army’s technical team is working to remove the severely damaged section and develop a new track to restore vehicular movement.

The floods triggered by the disaster in Rasuwa on August 26 caused extensive damage to the Prithvi Highway at several locations in Dhading. Sections around Sital Bazaar, Krishna Bhir and Parewa Bhir were washed away or severely eroded by the swollen Trishuli River, disrupting one of the country’s major road connections and affecting traffic between Kathmandu, Chitwan and Pokhara.

Technicians said normal repair work would not be sufficient to immediately reopen the highway, particularly at Sital Bazaar, where a substantial portion of the road towards the river has been washed away. Considering the extent of the damage and the geographical risks, authorities have opted to use controlled blasting to prepare a new road structure.

The Prithvi Highway is a vital transport corridor linking Kathmandu with major cities, districts and commercial centres across the country. Prolonged disruption along the highway can leave passenger and freight vehicles stranded, affect the supply of essential goods and force travellers to rely on longer alternative routes.

The floods have caused erosion, landslides and road collapses at several points along the highway. Dozers and other heavy equipment are being deployed to clear damaged sections, while technical assessments are underway to identify safer alternatives and construct temporary routes in high-risk areas.

The Nepali Army, Department of Roads and other technical teams are coordinating efforts to restore the damaged sections as quickly as possible.

Publish Date : 13 September 2026 13:05 PM

Budi Gandaki flood victims receive 28 tents after three days

KATHMANDU: The Red Cross has set up 28 temporary shelters

RSP candidate selection framework rules out money, influence and factionalism

KATHMANDU: The Rastriya Swatantra Party (RSP) has said financial status,

Parliamentary committee approves 10 ambassadorial nominees, rejects Sunar for Saudi Arabia

KATHMANDU: The Parliamentary Hearing Committee has approved 10 of the

Home Minister Gurung meets Indian Foreign Minister Jaishankar at airport

KATHMANDU: Home Minister Sudan Gurung held an impromptu meeting with

Foreign Minister Khanal meets South Korean ambassador Park

KATHMANDU: Foreign Minister Shishir Khanal held a courtesy meeting with