Monday, November 16th, 2026

BP Highway reopens after rain-induced obstruction



KATHMANDU: Traffic has resumed along the BP Highway after heavy overnight rainfall triggered a debris blockage.

According to the Department of Roads, the highway was obstructed by debris between Narke and Pinthali, about three kilometres from Mangaltar toward Bhakunde, along a section currently under construction.

The road has been reopened after crews cleared the debris deposited by the rainfall, allowing vehicles to move along the route again. The department confirmed that stranded passengers and vehicles have resumed their journeys to their respective destinations.

Publish Date : 10 October 2026 11:44 AM

Kathmandu Valley’s minimum temperature rises by 2.4 degrees Celsius in a day

KATHMANDU: The minimum temperature in the Kathmandu Valley increased by

Farmers in Ilam busy harvesting paddy as harvest season begins

ILAM: Paddy harvesting has begun in the lower belt of

NRB fixes foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Western low-pressure system brings patchy clouds to Nepal’s Himalayan regions

KATHMANDU: A western low-pressure system is having a partial influence

EC invites political parties for talks on local polls

KATHMANDU: The Election Commission (EC) has invited political parties for