Tuesday, September 29th, 2026

Nepali Army estimates 121 people trapped in hydropower tunnels



KATHMANDU: The Nepali Army has estimated that 121 people have been trapped inside tunnels at various hydropower projects in Rasuwa following the devastating Bhotekoshi flood on August 26.

Brigadier General Subash Jung Thapa shared the estimate at a press conference organized by the National Disaster Risk Reduction and Management Authority on Monday.

“Based on our assessment, it appears that 121 people entered the tunnels,” Thapa said. “We will continue search and rescue operations until all the tunnels have been searched.” He added that some other hydropower project workers are believed to be trapped outside the tunnels.

Publish Date : 07 September 2026 15:40 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Trucks line up from Kalanki to Balkhu as Prithvi Highway remains blocked

KATHMANDU: Trucks have lined up across Kathmandu after the Prithvi

Russia’s ambassador to Nepal, Alexi, calls on Minister Pokharel

KATHMANDU: Russia’s ambassador to Nepal, Alexi Vladimirovich Surovtsev, today paid

Solar system installed at Timure telephone tower, ending need to transport diesel

KATHMANDU: A solar power system has been installed at Nepal

Two more bodies recovered from Himlung avalanche, death toll reaches four

MANANG: The bodies of two more people who died in