Wednesday, December 24th, 2025

Minister Ghising inspects Araniko Highway blocked for two months



KATHMANDU: Minister for Physical Infrastructure and Transport Kulman Ghising inspected the Bahrabise–Tatopani section of the Araniko Highway, which has remained blocked for the past two months due to landslides.

The road closure has stranded more than a thousand containers arriving from China. With the festive season of Dashain, Tihar, and Chhath approaching, there is little likelihood of the goods reaching Nepal on time.

Determined to address the situation, Minister Ghising personally reached the site, walking through the muddy and damaged road section to observe the condition firsthand.

Immediately after taking office, Ghising had already directed concerned authorities to expedite efforts to clear the road and restore traffic movement.

Photos: Nepal Photo Library

Publish Date : 22 September 2025 18:04 PM

Early morning chill persists in Kathmandu Valley

KATHMANDU: The Kathmandu Valley recorded the same minimum temperature on

NC holding Central Work Execution Committee meeting today

KATHMANDU: The Nepali Congress (NC) is holding a meeting of

Election 71 days away: Parties intensify PR list preparations

KATHMANDU: With 71 days remaining until the election of members

Three Shocks that Shook the World in 2025

This was the year that the remaining pillars of the

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign currency