Monday, August 24th, 2026

Kaligandaki Corridor reopens after four-day obstruction



BAGLUNG: The Baglung section of the Kaligandaki Corridor, which was blocked for four days by a massive landslide, has reopened to traffic.

The landslide occurred on Saturday at Kalakhola Bagar in Baglung Municipality-13 following continuous rainfall. Efforts to clear the debris began on Sunday but were delayed due to the scale of the landslide.

According to Police Inspector Keshav Thapa of the District Police Office, Baglung, the road was finally opened on Tuesday afternoon after coordination between the Road Corridor Project and local contractors.

A 40-meter section of the road had to be rerouted to resume traffic flow. Additional rock cutting is still underway to enable the passage of heavy goods vehicles.

Publish Date : 13 August 2025 07:42 AM

PM Shah to return to Kathmandu after three-day private visit

KATHMANDU: Prime Minister (PM) Balendra Shah has been in Gandaki

Low-fat vegan diet may help people lose weight without eating less: Research

WASHINGTON DC: A low-fat vegan diet may support weight loss

Foreign currency exchange rates fixed for today

KATHMANDU: Nepal Rastra Bank (NRB) has published the official foreign

HoR meeting taking place today

KATHMANDU: The House of Representatives (HoR), the lower house of

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of