Saturday, June 27th, 2026

Kaligandaki Corridor reopens after four-day obstruction



BAGLUNG: The Baglung section of the Kaligandaki Corridor, which was blocked for four days by a massive landslide, has reopened to traffic.

The landslide occurred on Saturday at Kalakhola Bagar in Baglung Municipality-13 following continuous rainfall. Efforts to clear the debris began on Sunday but were delayed due to the scale of the landslide.

According to Police Inspector Keshav Thapa of the District Police Office, Baglung, the road was finally opened on Tuesday afternoon after coordination between the Road Corridor Project and local contractors.

A 40-meter section of the road had to be rerouted to resume traffic flow. Additional rock cutting is still underway to enable the passage of heavy goods vehicles.

Publish Date : 13 August 2025 07:42 AM

World Cup 2026: Mbappe moves level with Klose in WC goal involvements

MASSACHUSETTS: France captain Kylian Mbappe etched his name deeper into

WC: Senegal thrash Iraq 5-0 to keep knockout hopes alive

TORONTO: Senegal etched their names in history books as they

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Man arrested on charges of infant murder and incest in Jhapa

BHADRAPUR: Police have arrested a man accused of killing a

Oli, Prachanda, Madhav Nepal to share stage after long gap

KATHMANDU: After a long interval, top communist leaders are set