Tuesday, April 21st, 2026

Construction of Sky Walk in Ainapahara in final stage



DAMAULI: The construction of the ‘Sky Walk’ at Ainapahara, a growing tourist destination in Aanbukhaireni Rural Municipality of Tanahun, is nearing completion. Initiated in the second week of the previous month, the project has now entered its final phase.

The sky walk has been developed in Aanbukhaireni Rural Municipality–2 with the aim of establishing Ainapahara as a major tourism hub, said Rural Municipality Chairperson Shukra Chuman.

Built at a cost of Rs 1.5 million, preparations are underway to bring it into commercial operation within a few days.

Spanning 57 meters in length and rising 50 meters above ground, the structure features one-foot spacing between each step to enhance the sense of adventure.

“Visitors can enjoy a unique walking experience surrounded by lush greenery, tranquil mountain views, and open skies. There’s no need for fear, as the structure is built to high safety standards,” Chuman added.

As the area has grown increasingly popular among domestic tourists, the rural municipality has invested in additional infrastructure. Chuman expressed confidence that the sky walk will boost both tourism and adventure activities in the region.

Situated along the Prithvi Highway, Ainapahara has seen a sharp rise in visitor numbers, especially on weekends. “On Saturdays alone, more than a thousand tourists visit,” said Aash Bahadur Gurung, ward chair of Aanbukhaireni–2. The site is especially attractive due to its accessibility and artistic features, including sculptures carved into the rocks.

The rural municipality has already earned more than Rs 6 million from Ainapahara tourism. To enhance its appeal, a garden has been built, and several stone carvings—including a waterfall-side figure of Lord Ganesh, a mother and child, and an angel—have been added.

The waterfall is fed by the Siudi River, which flows from the base of Chimkeshwari, the highest peak in the Mahabharat range in Tanahun. A detailed master plan has been prepared for the site’s development, estimating a total budget of Rs 100 million.

According to the plan, the area will include new structures such as a Buddha statue, railings, and parking facilities.

Publish Date : 09 July 2025 11:14 AM

Govt claims new driving licenses meet international standard issued via security printing centre

KATHMANDU: The government has claimed that driving licenses printed through

Reforms to strengthen Planning Commission, Policy Research Institute: PM Shah

KATHMANDU: Prime Minister Balendra Shah has said the government will

RSP studying allegations against Home Minister, no clarification sought yet: Bhupadev Shah

KATHMANDU: Rastriya Swatantra Party General Secretary Bhupadev Shah has said

SC refuses to register writ petition against Rabi Lamichhane

KATHMANDU: The Supreme Court of Nepal has refused to register

Heat wave risk persists in Tarai for next three days; temperatures cross 40°C

KATHMANDU: The Department of Hydrology and Meteorology has warned that