Saturday, September 5th, 2026

Jufal Airport reopens after 53-day closure for runway upgrade



DOLPA: Operations at Jufal Airport in Dolpa have resumed following a 53-day closure for runway upgrades.

The airport underwent temporary closure to facilitate the enhancement of its 185-meter-long runway, a project completed at a cost of Rs 60 million, inclusive of VAT, confirmed Bir Prasad Shahi, an engineer with the Civil Aviation Authority.

This morning, a Tara Air flight originating from Nepalgunj touched down at Jufal, signaling the restoration of services.

The previous state of the runway, in disrepair, had posed safety concerns for travelers.

Jufal Airport stands as the primary aviation hub in Dolpa of Karnali Province, serving as a vital lifeline for the region, which boasts the distinction of being the largest district in the country.

Publish Date : 21 April 2024 12:33 PM

Nepali kickboxer Abiral Ghimire “Himalayan Cheetah” crowned world champion

KATHMANDU: Nepali young kickboxer Abiral Ghimire, popularly known as the

Day 11 of Bhotekoshi flood: Power infrastructure restoration and tunnel rescue efforts intensified

KATHMANDU: The devastating Bhotekoshi River flood has caused extensive damage

Chinese Embassy team meets citizen rescued from Trishuli-1 tunnel after 11 days

KATHMANDU: A team from the Chinese Embassy in Nepal has

APF to provide Rs 2.5 million to each family of its on-duty staff killed in disaster

KATHMANDU: The Armed Police Force (APF) Nepal has decided to

Bhotekoshi flood causes extensive damage to roads and eight hydropower projects in Rasuwa

RASUWA: The Bhotekoshi flood has caused extensive damage to private