Sunday, December 21st, 2025

New Road: Pavement expansion begins (In pics)



KATHMANDU: Following an order from the Patan High Court, the Kathmandu Metropolitan City (KMC) has commenced the expansion of the footpath in New Road.

The expansion work began on Wednesday morning, covering the stretch from Juddha Shalik to Indra Chowk.

Previously halted by the Divisional Road Office, the KMC sought intervention from the High Court.

In response, a joint bench of Judges Dhruba Raj Nanda and Prakash Kharel issued an interim order, allowing the expansion to proceed.

The court noted that, under Article 57 of the Constitution of Nepal, local authorities retain rights over local roads, rural roads, agricultural roads, and irrigation.

This constitutional provision favored the KMC, paving the way for the footpath expansion to continue.

Publish Date : 17 July 2024 12:50 PM

Number of people seeking foreign employment from Karnali on the rise

SURKHET: The number of people going abroad for foreign employment

EC proposes strict rules on use of vehicles for March 5 polls

KATHMANDU: The Election Commission (EC) has drafted a proposed Code

Kathmandu Valley records drop in minimum temperature

KATHMANDU: The minimum temperature of the Kathmandu Valley recorded in

World Meditation Day being observed today

KATHMANDU: As declared by the United Nations, World Meditation Day

NRB releases today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign currency