Saturday, December 28th, 2024

Breakthrough of Nagdhunga-Sisnekhola Tunnel (In pics)


15 April 2024  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Prime Minister (PM) Pushpa Kamal Dahal Prachanda, accompanied by Deputy Prime Minister and Physical Infrastructure Minister Raghubir Mahaseth, initiated the breakthrough of the Nagdhunga tunnel route on Monday.

The tunnel spans 2,667 meters from Chandragiri, Belambu, Dhading to Sisnekhola.

Although the tunnel was completed last August, it will take another year before vehicles can traverse through the main tunnel.

Remaining tasks include road slope work within the tunnel, installation of lighting, and oxygen pipes.

Originally slated for completion by June of the previous year, delays have pushed the timeline forward.

The tunnel features three underpasses aimed at easing traffic congestion and shortening the distance between Kathmandu.

Additionally, it includes four box culverts and one overpass.

The Nagdhunga-Sisneri tunnel project office outlines plans for three bridges and a flyover along this route, connecting the Kathmandu-Dhading section of the highway.

Publish Date : 15 April 2024 15:38 PM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

Rain and snowfall likely in select areas

KATHMANDU: The weather is expected to be generally cloudy across

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has set the foreign exchange rates

Earthquake jolts Kalikot

KALIKOT: An earthquake struck Kalikot last night. The tremor, measuring

Sri Lankan Former President Wickremesinghe arriving in Kathmandu today

KATHMANDU: Former President of Sri Lanka, Ranil Wickremesinghe, is scheduled