Sunday, January 19th, 2025

PM Dahal laying foundation stone for Narayani Bridge in Chitwan


13 May 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

CHITWAN: Prime Minister (PM) Pushpa Kamal Dahal Prachanda, currently in Chitwan, is scheduled to lay the foundation stone for the new bridge over the Narayani River.

This cable-stayed marvel, a cornerstone of connectivity, will span 420 meters across the river, linking Narayangadh in Chitwan and Gaindakot in Nawalpur along the East-West Highway.

Planned under the eye of the Bridge Division of the Road Department, this bridge promises innovation and accessibility.

Featuring four pillars on its expansive 12-meter width, it will stand to the north of its predecessor, offering improved elevation and a design accommodating small watercraft beneath its lower arches.

Publish Date : 13 May 2024 10:59 AM

Three parliamentary committees to hold meetings today

KATHMANDU: Three committees under the Federal Parliament are scheduled to

Today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank has set the foreign exchange rates

Today’s weather forecast: Partly cloudy in hill areas

KATHMANDU: The country is currently experiencing the influence of western

‘Improve electoral system assuring proportional and inclusive representation’

KATHMANDU: Various stakeholders have highlighted the need of reforming the

Former Koshi Province Chief Minister Thapa attacked, two arrested

JHAPA: Former Koshi Province Chief Minister Uddhav Thapa was attacked