Sunday, April 27th, 2025

Obstructed Karnali Highway comes into operation


11 August 2024  

Time taken to read : < 1 Minute


  • A
  • A
  • A

JUMLA: The Karnali Highway that was obstructed due to torrential rain-triggered landslides has come into operation.

The Surkhet-Jumla road section has opened since this morning after the landslide at Pili, Kalyankhola and Birtamode of Kalikot was removed.

Information officer at the Jumla-based Road Division Office Bir Bahadur GT said the highway has become fully operational after the removal of landslide debris.

It has been difficult to upgrade the highway from time to time due to a lack of an adequate budget, he said, adding that the road has been repaired optimally by utilizing available resources and means.

Locals have demanded immediate up-gradation of the road.

Publish Date : 11 August 2024 10:50 AM

Former Education Minister Sumana urges agitating teachers to reject govt’s dictatorial tendencies

KATHMANDU: Rastriya Swatantra Party (RSP) MP and former Education Minister

NEPSE index gains 3.58 points, closes at 2,661.60

KATHMANDU: The Nepal Stock Exchange (NEPSE) rose by 3.58 points

Parliamentary Committee directs govt to devise reliable guiding principles and policies

KATHMANDU: The Committee for Monitoring and Evaluating the Implementation of

Journalist Sabina Karki injured in clash during teachers’ protest

KATHMANDU: Journalist Sabina Karki, who was covering the teachers’ protest

62 teachers injured in clash with police: Federation

KATHMANDU: The Teachers Federation has reported that 62 teachers were