Tuesday, October 13th, 2026

Trishuli bridge closed following cable snapping



NUWAKOT: The bridge over the Trishuli River at Bidur Municipality-6 in Nuwakot district has been completely shut down for both pedestrian and vehicular traffic after one of its four cables snapped, announced Rajan Shrestha, the Mayor of Bidur Municipality.

Constructed nearly 40 years ago during the development of the Devighat Hydropower Centre, the bridge has been a vital link for local communities.

However, concerns over its structural integrity arose when the cable issue was first detected in December last year. Since then, only two-wheel vehicles were permitted to pass through the bridge.

Mayor Shrestha has assured the public that efforts are underway to promptly repair the bridge, aiming to reopen it at the earliest opportunity.

In the meantime, the Municipality has advised drivers and pedestrians to utilize alternative routes via the bridges at Dhunibesi of Simchaur and Devighat.

The closure of the Trishuli bridge at Bidur Municipality-6 has disrupted the direct connection between Bidur Municipality-4 and Mandredhunga of Bidur-6, impacting travel routes leading to Tarakeshwar Rural Municipality and Dhadingbesi.

The closure of the bridge underscores the importance of timely infrastructure maintenance and highlights the challenges posed by aging infrastructure in rural areas.

RSS

Publish Date : 06 April 2024 09:05 AM

Road repair work intensified ahead of festivals

NARAYANGADH: The Road Division Office in Bharatpur has intensified repair

Bhojpur’s Mahadevthan being developed as a religious tourism destination

BHOJPUR: Mahadevthan, a historic religious site on the banks of

Third day of Navaratra: Chandraghanta Devi worshipped today

KATHMANDU: Chandraghanta Devi, the third of the nine forms of

NRB fixes foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has announced the foreign currency

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of