Thursday, November 21st, 2024

Two-way traffic resumes on Muglin-Narayangadh road section


29 July 2023  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MUGLIN: The Muglin-Narayangadh road section, which was blocked by a landslide, is now fully operational.

The landslide occurred near Kalikhola of Ichchakamana rural municipality-5 in Chitwan at 1 am this morning.

The Road Division Office Chitwan swiftly responded to the situation, using an excavator to clear the landslide, allowing the transport service to resume at 3 am.

As a result, the halted vehicles were able to continue their journey once the debris was removed.

It may be noted that the Narayangadh Muglin road section has experienced multiple blockages in the past due to landslides.

Publish Date : 29 July 2023 07:37 AM

SC ruling on leaving additional 20 meters along riverbanks not to be implemented now

KATHMANDU: The Supreme Court’s verdict requiring an additional 20 meters

India warns of ‘further damage’ to Canada ties

NEW DELHI: India warned Canada of “further damage” to already

Prime Minister Oli’s visit to China expected to further strengthen bilateral ties

KATHMANDU: A bilateral meeting was held between the leaders of

Cooperative fraud case: Former DIG Chhabilal Joshi’s statement begins in Kathmandu

KATHMANDU: The statement of Chhabilal Joshi, the then vice-chair of

Nepal-India military collaboration talks concluded at NA headquarters

KATHMANDU: Chief of the Army Staff Ashok Raj Sigdel and