Tuesday, March 18th, 2025

Two-way traffic resumes on Muglin-Narayangadh road section


29 July 2023  

Time taken to read : < 1 Minute


  • A
  • A
  • A

MUGLIN: The Muglin-Narayangadh road section, which was blocked by a landslide, is now fully operational.

The landslide occurred near Kalikhola of Ichchakamana rural municipality-5 in Chitwan at 1 am this morning.

The Road Division Office Chitwan swiftly responded to the situation, using an excavator to clear the landslide, allowing the transport service to resume at 3 am.

As a result, the halted vehicles were able to continue their journey once the debris was removed.

It may be noted that the Narayangadh Muglin road section has experienced multiple blockages in the past due to landslides.

Publish Date : 29 July 2023 07:37 AM

Truck driver arrested with Rs 250 million was previously arrested for gold smuggling

KATHMANDU: The truck driver arrested on Tuesday morning with illegal

Stand and floodlight installation at TU Cricket Ground to be completed by May 7

KATHMANDU: The Ministry of Urban Development has announced that the

One arrested with over Rs 200 million in cash

KATHMANDU: Police have arrested a person in possession of over

Newly appointed IGP Deepak Thapa awarded rank insignia

KATHMANDU: Deepak Thapa has been formally awarded the rank insignia

Ministry of Urban Development reports Rs 12.24 billion expenditure in current fiscal year

KATHMANDU: The Ministry of Urban Development has spent Rs 12.24