Tuesday, December 23rd, 2025

Two-way traffic resumes on Muglin-Narayangadh road section



MUGLIN: The Muglin-Narayangadh road section, which was blocked by a landslide, is now fully operational.

The landslide occurred near Kalikhola of Ichchakamana rural municipality-5 in Chitwan at 1 am this morning.

The Road Division Office Chitwan swiftly responded to the situation, using an excavator to clear the landslide, allowing the transport service to resume at 3 am.

As a result, the halted vehicles were able to continue their journey once the debris was removed.

It may be noted that the Narayangadh Muglin road section has experienced multiple blockages in the past due to landslides.

Publish Date : 29 July 2023 07:37 AM

Imports worth Rs 359 billion enter Nepal through Birgunj customs in five months

BIRGUNJ: Goods and commodities worth Rs 359.23 billion have been

Pokhara Metropolis to remove roadside workshops, garages from major roads

POKHARA: Pokhara Metropolitan City has announced a plan to remove

Rabi Lamichhane–Balen Shah meeting sparks speculation of political alignment

KATHMANDU: A meeting between Rastriya Swatantra Party (RSP) Chair Rabi

UML holds nationwide joint meeting to disseminate message of 11th national convention

KATHMANDU: The CPN-UML is holding a joint meeting of all

Preparations underway for Budhigandaki ‘A’ and ‘B’ hydropower projects

GORKHA: Preparatory work has begun for the construction of the