Saturday, November 23rd, 2024

Khotang prepares for next round of booster doses against COVID-19


17 May 2023  

Time taken to read : 2 Minute


  • A
  • A
  • A

KHOTANG: A hilly district in the Koshi Province, Khotang has prepared for administering a booster dose of COVID-19.

The district-level Covid- 19 Vaccine Coordination Committee decided to give a booster dose to those who have already completed six months of receiving the first or both shots.

District Health Office Chief Punya Prasad Sigdel said they are prepared for providing an additional dose to 14,340 people through 240 vaccination centers in two municipalities and eight rural municipalities in the district.

The campaign will conclude on May 21. Citizens above 55, health professionals, female health volunteers, people with chronic disease who are above 12 and people with low immune systems and who missed the booster shot earlier are the target groups this time.

It is said 6,000 people in the district were given COVID-19 booster doses in between April 9 and May 2.

According to the National Census, 2078 BS, the district’s population is 206,312 and of them, 107,042 have already got the full course of the vaccine.

Fifteen people succumbed to the virus during its epidemic.

Most of the COVID-19 hospitals established during the epidemic in Khotang have remained closed at the moment.

Such facilities in Halesi Tuwachung municipality and Rawabensi and Sakela rural municipalities are operational as general hospitals.

RSS

Publish Date : 17 May 2023 14:51 PM

Emphasis on protection of Right to reproductive health

KATHMANDU: Various speakers have pointed out the need to strengthen

Gajendra Narayan Singh Hospital construction still incomplete after six years

SAPTARI: The construction of the 300-bed Gajendra Narayan Singh Hospital

Construction of 135 MW Manang Marsyangdi HP starts

KATHMANDU: Financial closure for the 135 MW Manang Marsyangdi Hydropower

Calls to revoke China’s trade status widen in Washington

WASHINGTON DC: Influential members of Congress, including the senator poised

Power from Sanjen Hydro Project connected to national grid

KATHMANDU: The power produced by the Sanjen Hydropower Project has