Wednesday, October 14th, 2026

Pokhara-Baglung road traffic obstructed



POKHARA: The Pokhara-Baglung road section along the Mid-Hill Highway has been obstructed due to incessant rain since Tuesday evening.

The landslide that occurred at Modi Rural Municipality-5, Bajung, Bhyaple in Parbat had disrupted the road since last night.

As boulders are rolling down on the road along with torrential rain, it was difficult to remove the debris and resume traffic operation, shared District Traffic Police Office chief Suman Neure.

Likewise, similar problem has emerged in Modikhet (near to Bhyapl) when boulders blocked the road.

Police said the boulders obstructing vehicular movement would be removed to bring back the road traffic.

Due to road blockage, several vehicles bound to different destinations from Parbat, Baglung, Myagdi and Mustang are being stranded on the road.

According to the police administration, the disrupted road would be brought into re-operation this afternoon.

Publish Date : 31 August 2022 10:49 AM

Light rain likely in Bagmati, Gandaki and Lumbini

KATHMANDU: Light rainfall is likely at one or two places

Nepal needs fair transit access like other landlocked nations

India is Nepal’s largest trading partner, but Nepal’s private sector

From political renewal to national resurgence: Nepal’s path to strategic stability

For almost four decades, Nepal has experienced repeated political transformations

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

NRB extends loan repayment deadline for flood-hit borrowers until mid-January

KATHMANDU: Nepal Rastra Bank (NRB) has extended the deadline for