Friday, July 24th, 2026

Power import shrunk leads to load-shedding in industries



KATHMANDU: The industrial sector has not been able to get electricity as the power imported from India has shrunk due to the power crisis in India.

According to Nepal Electricity Authority spokesperson Suresh Bhattarai, electricity could not be imported into the Bihar region of India due to transmission line maintenance. That is why industries are not getting electricity.

He said that this problem will continue for a few more days.

“They said the repairs would be completed by Friday. This means the supply will be regular immediately after the maintenance is over,” Bhattarai said.

He added that it might take 5-6 days maximum for the power supply to be normal.

 

Publish Date : 27 April 2022 19:33 PM

Nepal suffers defeat against Netherlands

KATHMANDU: Nepal suffered a six-wicket defeat against the Netherlands in

NRB issues today’s foreign currency exchange rates

KATHMANDU: Nepal Rastra Bank (NRB) has fixed the foreign exchange

Monsoon rains block nine highways, disrupt dozens of roads

KATHMANDU: Continuous monsoon rains have triggered landslides and road erosion

Monsoon conditions persist; heavy rainfall likely today

KATHMANDU: Monsoon conditions continue to affect the country, with rain

Honorary Consuls boost Nepal’s economic diplomacy: Foreign Minister Khanal

I take this opportunity to express my sincere appreciation for