Monday, December 22nd, 2025

Floods damage a temporary bridge in Melamchi



MELAMCHI: A temporary bridge in ward no. 11 of Melamchi Municipality has been damaged by flood water last night.

A hump pipe was installed as a temporary bridge after the concrete bridge over the Melamchi river was washed away by the floods in July last year.

Local Dasharath Danuwar said that the road was closed as soon as the temporary bridge was damaged.

Locals of 6 wards in the municipality have been affected as a result. Meanwhile, fearing floods, locals around Helambu and Melamchi left their homes and went to safer grounds at midnight.

Prabha Bhandari of Helambu-2 said that she left home at 12 pm and went to a higher location.

Publish Date : 25 June 2022 07:26 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Government to register and list online television channels

KATHMANDU: The government of Nepal has decided to register and

PM Karki holds meeting with RSP chair Rabi Lamichhane

KATHMANDU: Prime Minister Sushila Karki and Rastriya Swatantra Party (RSP)

Equipment of Jumla’s Tila Micro Hydropower Project abandoned

JUMLA: Electrical equipment worth crores of rupees has been abandoned

100 days of govt: Hope unfulfilled, elections uncertain

KATHMANDU: The government led by Prime Minister (PM) Sushila Karki,