Saturday, August 29th, 2026

Swollen Seti River erodes bridge in Pokhara, disrupting transportation



POKHARA: The flooded Seti River has damaged a motorable bridge linking two wards of Pokhara Metropolitan City, disrupting transportation.

The river swollen due to torrential rain since Saturday night has eroded the foundation of the bridge, said the Division Road Office, Pokhara, adding that as a result, people’s mobility through the damaged bridge poses risk.

Structures of the bridge should be relocated to elsewhere, the road office said.

The river has damaged pillars of the bridge, said Pushpendra Pandey, ward chair of the metropolis-19.

The 72 meters long and 7 meters wide bridge was constructed five years ago by the road office.

Similarly, the river also eroded another road linking Bharawari and Kavre, disrupting transportation, said a local school teacher Santosh Acharya.

Publish Date : 19 June 2022 15:41 PM

NOC sends 40,840 litres of aviation fuel for flood rescue operations

KATHMANDU: Nepal Oil Corporation (NOC) has sent 40,840 litres of

Chinese embassy rejects claims of withholding flood warnings from Nepal

KATHMANDU: The Chinese Embassy in Nepal has clarified allegations that

Foreign Minister’s visit to Serbia cancelled

KATHMANDU: Minister for Foreign Affairs, Shisir Khanal, has cancelled his

Nepal Telecom restores services at Trishuli-3A site

KATHMANDU: Nepal Telecom has resumed its services through a tower

208 people, including 43 foreigners, rescued from Trishuli-3 tunnel

KATHMANDU: A total of 208 people, including 43 foreign nationals,