Saturday, August 29th, 2026

Traffic obstructed in Dumre-Besisahar road



TANAHU: The Dumre-Besisahar road section has been blocked after hume pipe culvert placed near Kudulephant in Bhanu Municipality-8 was washed away.

The floodwaters in Kharekhola swept away three hume pipes, disrupting traffic. Hume pipes were damaged by floods on Sunday morning after incessant rains.

Though small vehicles came into operation using alternative routes, large vehicles have been stopped, said Ramesh Bista, Inspector at the Area Police Office, Bhanu.

RSS

Publish Date : 19 June 2022 09:41 AM

537 workers remain missing from nine hydropower projects

KATHMANDU: A total of 537 employees and workers at nine

NOC sends 40,840 litres of aviation fuel for flood rescue operations

KATHMANDU: Nepal Oil Corporation (NOC) has sent 40,840 litres of

Chinese embassy rejects claims of withholding flood warnings from Nepal

KATHMANDU: The Chinese Embassy in Nepal has clarified allegations that

Foreign Minister’s visit to Serbia cancelled

KATHMANDU: Minister for Foreign Affairs, Shisir Khanal, has cancelled his

Nepal Telecom restores services at Trishuli-3A site

KATHMANDU: Nepal Telecom has resumed its services through a tower