Monday, July 27th, 2026

Two-way traffic resumes on Narayangadh-Muglin section



MUGLIN: The vehicular movement disrupted in the Narayangadh-Muglin section has resumed two-way. Landslip had disrupted the traffic since Monday midnight.

District Police Office, Chitwan has informed that the road is operational with two-way traffic since this morning.

Similarly, after four days’ efforts, the Anbukhaireni section of Prithvi Highway has been operative two-way. The two-way traffic resumed along the way since Monday evening.
The road was damaged near powerhouse at Anbukhaireni-4.

Earlier, the road was depressed. So, track was opened with inside removal of hill.

Publish Date : 14 June 2022 09:05 AM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

30 DDC outlets to be operational in Kathmandu Valley by mid-August

KATHMANDU: The Dairy Development Corporation (DDC) is preparing to bring

Man arrested for allegedly sharing MBS exam paper on WhatsApp

KATHMANDU: Police have arrested a man for allegedly sharing the

Two arrested with suspected narcotics in Birgunj

BIRGUNJ: Police have arrested two people on suspicion of possessing

Nagdhunga tunnel, Balambu flyover illuminated ahead of opening

KATHMANDU: The Nagdhunga–Sisnekhola Tunnel and the Balambu Flyover at the