Friday, April 17th, 2026

Beni-Jomsom road section resumes



BENI: The Beni-Jomsom road section along the Kaligandaki Corridor which had remained closed for three days has resumed from last evening.

With the resumption of vehicular movement, the vehicles have moved to their destinations, Supervisor of Beni-Jomsom Road section Indra Singh Sherchan said.

The road section was obstructed from Monday after a landslide at Kavrebhir caused due to torrential rain.

Likewise, the road near Ghopteodhar of the same site along the borderland of Myagdi and Mustang districts had collapsed, adding further owes to the vehicular movement.

It is said maintenance of 50 metres road was completed on Wednesday and Thursday with the mobilisation of construction equipment and human resources, Sherchan added.

During the monsoon season, the Myagdi section of the highway is at high risk of frequent disruptions.

RSS

Publish Date : 05 August 2022 09:22 AM

Economic Digest: Nepal’s Business News in a Snap

KATHMANDU: Economic Digest offers a concise yet comprehensive overview of

NRB issues foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has set the foreign exchange

Partly cloudy skies with rain, snow likely; temperatures climb in Terai regions

KATHMANDU: The partial influence of western and local wind systems

National taekwondo competition begins today

KATHMANDU: The 25th ITF Taekwondo Competition, organized by the Nepal

New strategy amid crisis: Is UML-NCP unity possible again?

KATHMANDU: The results of the March 5 House of Representatives