Saturday, August 29th, 2026

Landslide obstructs mid-hill highway



BAGLUNG: The landslide caused by incessant rainfall here has obstructed the Baglung-Ghodabandhe section of the mid-hill highway since last night.

The landslide occurred near Bokse gully, the border of Baglung Municipality and Kathekhola Rural Municipality.

The movement of vehicles on long and short routes has been disrupted. In addition to landslide, big trees have slid onto the road, making it difficult to clear obstruction anytime soon.

Deputy Superintendent of Police, Indra Bahadur Rana, informed that efforts were underway to resume the transportation.

Connection to seven local levels in the western belt of the district has been lost due to the road obstruction.

Similarly, the vehicles heading to Rukum and Rolpa are also stranded.

Meanwhile, the Baglung-Kushmishera roadway has also been disrupted due to landslip.

The landslip occurred at Dablyang of Baglung Municipality-10.

Publish Date : 05 July 2022 10:16 AM

Flood risk persists in Bhotekoshi

KATHMANDU: The Flood Forecasting Division under the Hydrology and Water

Rasuwa flood: 553 bodies recovered, 1,473 rescued so far

KATHMANDU: The death toll from the flash flood in the

Mother and daughter die after being swept away by flash flood in Pokhara

POKHARA: A mother and her two-year-old daughter died after being

Bodies recovered from flood-hit rivers being managed at various hospitals

KATHMANDU: A flash flood in the Bhotekoshi River in Rasuwa

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of