Friday, July 11th, 2025

Tanahu hydel project to construct another hydropower project


05 March 2022  

Time taken to read : < 1 Minute


  • A
  • A
  • A

DAMAULI: Tanahu Hydropower Ltd, which is constructing the 140-MW hydropower project at Rishing Rural Municipality-1 in the district, is to construct another hydel project.

The company is going to construct the 104-MW Lower Seti (Tanahu) Hydropower Project. The water for generating power from this project will be received from 140 meters tall concrete dam in the Seti River of Tanahu hydropower project and additional flow of the Madi River.

The company has already received permission for survey of power production.

An agreement was signed on April 12, 2019, for the procurement of consultancy service of detailed engineering design and bidding documents of the project from 3.5 million US Dollars received from Asian Development Bank.

Publish Date : 05 March 2022 07:10 AM

UML grapples with internal friction as Bidya Devi Bhandari eyes return

KATHMANDU: Amid rising speculation that former President Bidya Devi Bhandari

Bidya Devi Bhandari eyes UML leadership, open to future PM role

KATHMANDU: Former President Bidya Devi Bhandari has publicly expressed her

12 leftist parties to hold pro-Palestine demonstration in Kathmandu

KATHMANDU: A coalition of twelve leftist political parties, led by

Gold-silver dealers call off protest after agreement with govt

KATHMANDU: The ongoing protest by gold and silver traders across

Nepal’s banks accused of concealing non-performing loans

KATHMANDU: Former officials of Nepal’s central financial institutions have raised