Saturday, November 14th, 2026

Tanahu hydel project to construct another hydropower project



DAMAULI: Tanahu Hydropower Ltd, which is constructing the 140-MW hydropower project at Rishing Rural Municipality-1 in the district, is to construct another hydel project.

The company is going to construct the 104-MW Lower Seti (Tanahu) Hydropower Project. The water for generating power from this project will be received from 140 meters tall concrete dam in the Seti River of Tanahu hydropower project and additional flow of the Madi River.

The company has already received permission for survey of power production.

An agreement was signed on April 12, 2019, for the procurement of consultancy service of detailed engineering design and bidding documents of the project from 3.5 million US Dollars received from Asian Development Bank.

Publish Date : 05 March 2022 07:10 AM

FAA grounds all departing US flights following air traffic control communications outage

WASHINGTON DC: The US Federal Aviation Administration (FAA) has ordered

Madhesh Chief Minister Yadav to seek vote of confidence today

JANAKPURDHAM: Madhesh Province Chief Minister Krishna Prasad Yadav is set

NRB announces foreign currency exchange rates for today

KATHMANDU: Nepal Rastra Bank (NRB) has announced the official foreign

Guterres calls for urgent global action to curb greenhouse gas emissions

ANTALYA: United Nations Secretary-General Antonio Guterres has stressed the urgent

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of