Saturday, September 5th, 2026

Tanahu hydel project to construct another hydropower project



DAMAULI: Tanahu Hydropower Ltd, which is constructing the 140-MW hydropower project at Rishing Rural Municipality-1 in the district, is to construct another hydel project.

The company is going to construct the 104-MW Lower Seti (Tanahu) Hydropower Project. The water for generating power from this project will be received from 140 meters tall concrete dam in the Seti River of Tanahu hydropower project and additional flow of the Madi River.

The company has already received permission for survey of power production.

An agreement was signed on April 12, 2019, for the procurement of consultancy service of detailed engineering design and bidding documents of the project from 3.5 million US Dollars received from Asian Development Bank.

Publish Date : 05 March 2022 07:10 AM

Bhotekoshi flood update: Death toll reaches 1,344

KATHMANDU: The death toll from the Bhotekoshi flood has reached

Economic Digest: A Snapshot of Nepal’s Business News

KATHMANDU: Economic Digest presents a brief yet comprehensive roundup of

Authorities urge public not to believe glacial lake outburst rumors

KATHMANDU: The Flood Early Warning Center has urged the public

LPG companies ramp up supplies to ease gas shortage in Kathmandu

CHITWAN: Gas companies have stepped up efforts to prevent a

Foreign currency exchange rates fixed for today

KATHMANDU: Nepal Rastra Bank has fixed the foreign exchange rates