Monday, April 20th, 2026

Traffic resumes along Narayangadh-Muglin section



KATHMANDU: The Narayangadh-Muglin road section which was blocked by landslides has been opened for traffic after eight hours of the disruption.

The landslides occurred at Kerabari and Athahra Kilo of Bharatpur metropolis-29, Chitwan this morning led to the disruption of a two-way traffic along the highway.

According to District Police Office, Chitwan’s spokesperson Deputy Superintendent of Police, Narahari Adhikari, those vehicles remained stuck due to the highway disruption have left for destinations with the clearance of landslide depositions which was possible by the use of two loaders and an excavator.

Publish Date : 01 September 2022 17:39 PM

17 gharial nests found along Rapti River in Chitwan

CHITWAN: A total of 17 nests of gharial have been

Four non-resident ambassadors present credentials before Prez Paudel

KATHMANDU: Newly appointed non-resident ambassadors from various countries to Nepal

Imports near Rs 1.5 trillion in 9 months; exports rise by 18%

KATHMANDU: Nepal’s imports have reached nearly Rs 1.5 trillion in

RSP leaves vice-chair position vacant after Aryal becomes Speaker, secretariat reshaped

KATHMANDU: Rastriya Swatantra Party (RSP) has decided not to appoint

Nepal–UAE match interrupted by rain

KATHMANDU:  The first match between Nepal national cricket team and