Saturday, April 4th, 2026

Durbar High School formally resumes classes physically


Time taken to read : 3 Minute


  • A
  • A
  • A

KATHMANDU: The historic Durbar High School has formally started classes today with physical attendance of students.

Although the reconstruction of the school damaged in the Gurkha Earthquake in 2015 had completed in the Nepali month of Falgun in 2076 BS, its handover to the Government of Nepal had been affected due to Covid-19 pandemic.

Situated opposite to Ranipokhari, President Bidya Devi Bhandari had inaugurated the School on 21 October, 2020 following the completion of its reconstruction work by the Shanghai Construction Group, a Chinese company, at the cost of Rs 850 million.

Following the reconstruction, the School had run its classes virtually during the pandemic. Although the Kathmandu Metropolitan City (KMC)allowed class resumption physically a week ago, it took some more days to resume classes as there had been some administrative works remained to be done, said Paribeshman Bajracharya, ward member of the KMC -27.

Although the construction materials were new, the quake-damaged Durbar High School was rebuilt in its original style. The teaching learning activities in the School were being run in a temporary shelter nearby Balmiki Bidyapith at Pradashanimarga after the old building of the School sustained damages during the Gurkha Earthquake.

Spanning nine ropanis, the School has 60 classrooms in its four-storey building. Bhanu Secondary School and Sanskrit Secondary School have been running inside the premises of the Durbar High School.

Classes are run in English medium in the school that now has a new modern science lab. It also has two big libraries, yoga room, Ayurvedic Lab, computer labs, auditorium and a canteen among others.

Established in 1910 BS during the Rana regime, the School initially provided education to the children of Rana families, it was later opened for the public in 1957 BS.

At present, the school, an iconic monument, has 312 students against 80 in the past academic session. All quotas for grades 5, 6, 7 and 8 have been occupied, said the School Management.

The capacity of each room has been increased to accommodate 42 students from previously 36 given increasing enrollment rate, it was shared.

Publish Date : 31 January 2021 17:10 PM

Police arrest 17 individuals involved in hooliganism in Kathmandu

KATHMANDU: Police have arrested 17 individuals allegedly involved in hooligan

Dozers demolish illegal structures along Phewa Lake in Pokhara

KATHMANDU: Authorities have begun demolishing temporary structures built in violation

Power struggle intensifies in UML as Bishnu Paudel shifts stance after Oli’s arrest

KATHMANDU: A new power struggle has surfaced within the CPN-UML

Actor Sagar Lamsal arrested over rape allegation

KATHMANDU: Actor Sagar Lamsal, popularly known as Bale, has been

Ex-servicemen’s conference to begin from Sunday

KATHMANDU: The Nepali Army (NA) is set to organize its Ex-Servicemen’s