Saturday, November 23rd, 2024

Urban Ministry urged to complete construction of landfill site in Bancharedanda soon


29 August 2021  

Time taken to read : 2 Minute


  • A
  • A
  • A

KATHMANDU: Kathmandu Metropolitan City (KMC) has urged the Ministry of Urban Development to facilitate garbage management by completing the construction of the first shell of an under-construction landfill site at Bancharedanda.

Solid waste has been thrown and piled up in different parts of the city which has turned the Kathmandu Valley into a dirty and stinky capital.

As informed, it has been 14 days since Kathmandu garbage has not been collected regularly.

Chief of KMC Department of Environment Management, Hari Kumar Shrestha, said, “A mound of garbage kept at Sisdole has now been brought to Bancharedanda. Incessant rain has disturbed a lot in the road construction drive. Pick-up of solid waste will resume systematically once the rain is stopped. A landfill site alternative to Sisdole is an immediate need”.

KMC has been facing trouble in managing waste after the Sisdole is now filled with garbage. KMC has been managing the waste emanated from Kathmandu Valley at Nuwakot-based Sisdole for the past 13 years and the landfill site is now full of garbage.

Shrestha shared, “Road is not a key problem. Kathmandu Valley needs an area for long-term management of solid waste. There needs the construction of merely a 200-meter road to reach Bancharedanda from Sisdole.”

Information Officer of Urban Development Ministry, Suresh Kumar Wagle, shared the ministry is in preparation to hand over the first phase of the landfill site to KMC within a week after completing the construction works.

Around 1,200 metric tons of garbage generated in Kathmandu Valley each day is managed at Sisdole.

Publish Date : 29 August 2021 06:31 AM

Speaker Ghimire arrives in Cambodia

PHNOM PENH: Speaker Devraj Ghimire has arrived in Cambodia, leading

CM Kandel bats for collaboration to speed up development

JUMLA: Chief Minister of Karnali Province, Yamlal Kandel, has said

Board recommends parole for 285 prisoners

KATHMANDU: The Federal Probation and Parole Board has recommended granting

Emphasis on protection of Right to reproductive health

KATHMANDU: Various speakers have pointed out the need to strengthen

Gajendra Narayan Singh Hospital construction still incomplete after six years

SAPTARI: The construction of the 300-bed Gajendra Narayan Singh Hospital