Friday, January 23rd, 2026

PM Oli inaugurates bridge at Kamal River in Jhapa



JHAPA: Prime Minister KP Oli has inaugurated a concrete bridge at the Kamal River at Kamal Rural Municipality in Jhapa district Sunday.

The length of the bridge connecting Kampa Bazaar of the rural municipality to Dharampur of Shivasatakshi is 170 meters and the width is 11 meters.

The bridge has been constructed at a cost of Rs 166.264 million.

Meanwhile, Prime Minister Oli is also scheduled to lay a foundation stone of the China-Nepal Industrial Park, according to Hom Bahadur Thapa, a member of the Prime Minister’s Secretariat.

Prime Minister Oli is scheduled to lay the foundation stone of 31 bridges to be constructed on Madan Bhandari Highway today.

Publish Date : 28 February 2021 14:03 PM

Today’s News in a Nutshell

KATHMANDU: Khabarhub brings you a glimpse of major developments of

Ujyalo Nepal to support Mahabir Pun in Myagdi

KATHMANDU: The Ujyalo Nepal Party has decided to support former

Petroleum imports from Kakarbhitta exceed Rs 9.77 billion in six months

JHAPA: Petroleum products worth more than Rs 9.77 billion have

158 polling stations classified as highly sensitive in Sarlahi

BARHATHWA: As many as 158 polling stations in Sarlahi have