Tuesday, December 23rd, 2025

One-way traffic resumes in BP Highway



BANEPA: The BP highway has been resumed for traffic after the obstruction due to floods in Mamti river in Roshi rural municipality was cleared.

One-way traffic has been resumed at the joint initiative of police, the rural municipality, road project and locals.

The road section in the border of ward nos 11 and 12 of the rural municipality remained closed since 12:00 midnight on Friday and resumed at 2:30 pm on Saturday, police inspector at Area Police Office, Mangaltar Sherkhar Khadka said.

A dozer was used to clear the sludge gathered on the road and hence one-way traffic was resumed. A large number of vehicles and their passengers had remained stranded as a result.

Publish Date : 04 July 2021 11:15 AM

Gen-Z protest probe panel summons Ramesh Lekhak for statement

KATHMANDU: The investigation commission formed to study the human and

NEPSE gains marginally after two-day decline

KATHMANDU: The Nepal Stock Exchange (NEPSE), which had been on

Bangladesh suspends visa services for Indian nationals

KATHMANDU: The Bangladesh High Commission in New Delhi has temporarily

Rabi Lamichhane clarifies late-night meeting with Kathmandu Mayor Balen

KATHMANDU: Rastriya Swatantra Party (RSP) Chair Rabi Lamichhane on Tuesday

President Paudel to hold talks with Deuba, Oli and Prachanda

KATHMANDU: President Ram Chandra Paudel is set to hold discussions