Saturday, September 12th, 2026

Melamchi water distribution in Kathmandu to be stopped from June 15 for a month



KATHMANDU: The distribution of water from the Melamchi Drinking Water Project will be stopped for a month from June 15.

The Project has stated that the water has to be stopped for tunnel testing.

According to Rajendra Pant, divisional engineer of the the project, they were sending water during the three-month trial period, which has ended.

He said that a team of engineers will check if there are any defects in the tunnel. It will take at least 15 days to empty the water, and 10 days to inspect the tunnel.

Publish Date : 03 June 2021 15:16 PM

Nepal elect to bat first against UAE in ACC Premier Cup final

KATHMANDU: Nepal won the toss and elected to bat first

Process to evict squatters from Pokhara Bus Park area to resume tomorrow

POKHARA: Pokhara Metropolitan City is preparing to resume the process

Foreign currency exchange rates fixed for today

KATHMANDU: Nepal Rastra Bank has fixed the foreign currency exchange

ACC Premier Cup final: Nepal and UAE to clash today

KATHMANDU: Nepal and the United Arab Emirates (UAE) will face

Justice Beyond Borders: Reimagining Law in a Globalised World

The old map of law no longer fits the world