Monday, February 24th, 2025

Obstructed Aanbukhaireni-Muglin road resumes partially


28 August 2020  

Time taken to read : < 1 Minute


  • A
  • A
  • A

TANAHUN: Aanbukhaireni-Muglin road under the Prithvi Highway affected by a dry landslide has resumed one-way after over an hour.

It would take around two hours for the full resumption of the road, said Inspector Bikash Thapa at the Area Police Office, Aanbukhaireni.

“It will take some time to clear big rocks from the road,” he said.

The landslide occurred today near Ainapahara at Aanbukhaireni rural municipality-2 in Tanahun district. With the partial resumption of the road, vehicles stuck in the area have started moving towards their destinations.

Publish Date : 28 August 2020 19:17 PM

Maoist Center launches Tarai-Madhes awareness campaign

JHAPA: The Maoist Center has launched the ‘Tarai-Madhes Awareness Campaign’

Earthquake of magnitude 3.1 jolts Lamjung

LAMJUNG: An earthquake measuring 3.1 on the Richter scale was

KMC submits report on minor held against her will to NHRC

KATHMANDU: Kathmandu Metropolitan City (KMC) has submitted a 120-page investigation

House of Representatives meeting today to discuss key bills and public concerns

KATHMANDU: The House of Representatives under the federal parliament is

Administration bans meat and intoxicants in Pashupati Area during Shivaratri

KATHMANDU: The Kathmandu District Administration Office has prohibited the sale,