Friday, May 8th, 2026

Landslide blocks Narayangadh-Muglin road



CHITWAN: The Narayangadh-Muglin road has been blocked due to the landslide.

The road has been obstructed both ways due to the dry landslide at Chorkhola at Ichchakamana-6 in Chitwan on Saturday evening.

According to the Area Police Office, Muglin, the works to clear the landslide could not be started as the mudslide was still continuing.

Inspector Kanchan Tamang said that excavators are on standby to remove the landslide, adding that the work will be started after the landslide stops.

Publish Date : 08 August 2020 19:45 PM

One killed in tipper-motorcycle collision in Nawalparasi

NAWALPARASI: One person was killed and another injured after a

Concrete bridge completed at Kaikukhola along Kaligandaki Corridor

MYAGDI: A concrete bridge has been constructed at Kaikukhola along

Scooter rider dies in accident

DHANUSHA: A scooter rider was killed after a jeep collided

DHM chief says detailed study underway on 2026 monsoon forecast and impacts

KATHMANDU: Director General of the Department of Hydrology and Meteorology

Nepal ‘A’ defeats USA in one-day match

KATHMANDU: Nepal ‘A’ defeated the United States by three wickets