Saturday, October 3rd, 2026

Monsoon-induced landslide disrupts Beni-Jomsom road



MYAGDI: The Beni-Jomsom road that connects hilly districts Myagdi and Mustang has been disrupted by landslides induced by monsoon rains.

Beni-Jomsom-Korala road section which is the lifeline for Gandaki Pradesh has been disrupted after landslides occurred in various places along the road last night.

The incessant rain that started since Monday night has caused landslides at Nagdhunga, at Duwari of Danabari, Khola, Guithe and Mahabhir of Histan along the road in Annapurna rural municipality-2.

The people’s movement has been disrupted due to the rain-caused landslides.

The disrupted road cannot be brought into operation unless the rain comes to a pause, said Indra Singh Sherchan, a tourism entrepreneur.

Publish Date : 08 July 2020 06:20 AM

Geologists begin study of landslides in Myagdi

MYAGDI: A team of geologists began a field study of

Fuel shortage hits construction works

MUSTANG: The obstruction of Beni-Jomsom roadway has caused a shortage

President Paudel calls for technology-driven, relevant curriculum

LALITPUR: President Ramchandra Paudel has called for greater use of

Congress convention: Central-level candidates barred from contesting at provincial, district levels

KATHMANDU: Individuals contesting for any central-level position in the Nepali

Congress completes preparations for 15th general convention

KATHMANDU: The Nepali Congress has completed preparations for its 15th