Saturday, July 4th, 2026

Traffic resumes on Beni-Jomsom road



BENI: Vehicular movement has been resumed on the Beni-Jomsom road.

The road linking Mustang via the northern belt of Myagdi has been opened 18 days after it was disrupted due to landslide at several places.

Traffic on the 76-kilometer-long roadway was obstructed after the landslide at Rupse and Kavre of Annapurna rural municipality-3 in Myagdi and at Ghoptebhir on the border with Mustang washed away section of the road.

Chief of Beni-Jomsom-Korala Road Project, Ashok Tiwari said traffic has been resumed after removing the landslide debris deposited on the road, construction of diversion and new road at some places.

Publish Date : 02 October 2020 17:24 PM

Monsoon conditions persist, rain likely today

KATHMANDU: Monsoon conditions continue to influence weather across Nepal, with

World Cup: Argentina edge Cape Verde 3-2 after extra time

MIAMI: Defending champions Argentina survived a stunning challenge from Cape

Two absconding convicts arrested in Kanchanpur

KANCHANPUR: Police in Kanchanpur arrested two absconding convicts in separate

Singapore’s Anti-Corruption Miracle and Nepal’s Reform Imperative

Corruption is often discussed in Nepal as a moral failing,

100 days of Balen govt: Early momentum, high expectations and the real test ahead

KATHMANDU: The first 100 days of any government are often